Klukwan Inc. – Jones Point Stockpile Construction

 

  • On-time

    -without modifications to original contract

  • Within Budget

    -without modifications to original contract

  • 2009

    Completed

Chilkat Environmental made 5 stockpiles from a single failed stockpile that had sunk into the ground beneath groundwater saturation.  The stockpile design features drainage systems to remove water from petroleum-contaminated soil, expedite remediation and contain offsite migration of contaminants. After six years of drying out the soil 75% of the soil accomplished remediation goals.